Scope Of Work: | The Lee County Solid Waste Energy Recovery Facility (SWERF) desires to complete the installation of a 4.16KV distribution feeder extension project at their facilities located at 10500 Buckingham Road, Fort Myers, FL 33905. This scope of work shall include, but not be limited to the complete installation of: a new sectionalizing cabinet at the tap point with a new feeder tap of 5kv insulated cable in concrete installed underground, installation of a new 4.16kv-480 V 3-phase pad mounted distribution transformer with secondary disconnect switch and 480 V/277 V3-phase load center. Work additionally includes: supply and install of a new 300 A, 3-phase 480 V circuit with 500 MCM cables/conduits, retrofit installation of an existing sectionalizing cabinet, construction of concrete pads, supply and install of switchgear, raceway, panels, conduits, boxes, etc., and all associated tasks as necessary to complete the scope of work as detailed herein. All work shall follow specifications, terms, conditions, and plan details as contained within this solicitation. |