Scope Of Work: | Lee County Utilities is seeking Professional and Construction Engineering, Hydrogeological evaluation, design, permitting, oversight, construction observation, and operational testing services for the Green Meadows Water Treatment Plant (WTP) Wellfield Expansion. The Phase II Wellfield Expansion may consist of up to Twelve (12) wells drilled, Six (6) Lower Hawthorn, and Six (6) Sandstone Aquifers, Raw Water Transmission Main, and Surface Facilities. |