CMR220451BJB - CMAR Southeast Advanced Water Reclamation Facility


Solicitation #:CMR220451BJB
Opening Date:4/5/2023  2:30 PM
Scope Of Work:The Lee County Board of County Commissioners seeks to contract with a qualified Construction Manager at Risk (CM) for the construction of an advanced water reclamation facility (AWRF) capable of treating 6 million gallons per day (MGD) of wastewater. The underground infrastructure being built will allow for a facile expansion of the AWRF from an initial 6MGD to a maximum buildout of 10MGD. The AWRF will provide a conventional advanced treatment process consisting of the following major units: • Equalization tank;
• Headworks with bar screens and grit removal system;
• Splitter box;
• Oxidation ditches (5 Stage Bardenpho);
• Clarifiers;
• Deep bed gravity filters;
• Contact chambers;
• Clearwell;
• Conventional reuse system, consisting of a storage tank and booster pump station that will convey reuse to existing and new reuse customers or other offsite beneficial use consisting of an Indirect Potable Reuse (IPR) system;
• Reject system consisting of a ground storage tank;
• Alternative reuse system, , or both, to be determined during design;
• Deep Injection Well (DIW) system;
• Digesters;
• Sludge holding and dewatering system;
• Supporting chemical systems;
• Supporting odor control systems;
• Other miscellaneous systems such as storm water, electrical, SCADA, back-up power generators, etc.
• Main process building housing AWRF’s electrical room, server room, control room, break room, locker room, administrative offices, and storeroom for spare parts & separate maintenance repair shop.