LCU Electrical Staff has been working to create specific electrical standards and specification for all lift stations that are to be owned and maintained by Lee County.  New Lift Station Electrical Standards may be placed at the back of your plan set with no title block and do not require sign & seal.

Duplex Stations

208 Volt, 3 Phase

208 Volt, 3 Phase - With Generator

240 Volt, 1 Phase

240 Volt, 1 Phase - With Generator

240 Volt, 3 Phase

240 Volt, 3 Phase - With Generator

480 Volt, 3 Phase

480 Volt, 3 Phase - With Generator

Triplex Stations

480 Volt, 3 Phase - With Generator 

Master Pump Stations

Master Pump Stations - Available Upon Request

Waste-water Pump Station Electrical Tech Specs

Electrical Technical Specifications (With Bookmarks)

More