B180367DLK - Pine Island WWTP Effluent Pump Station Replacement


Solicitation #:B180367DLK
Opening Date:7/17/2018  2:30 PM
Scope Of Work:Lee County Board of County Commissioners and the Utilities Department seek to contract with a qualified Contractor to provide necessary services for the replacement of the effluent pump station.  The effluent pump station consists of an 8-foot diameter wet well approximately 15-feet deep, with (3) vertical turbine pumps and above ground piping and controls.  The above ground portion consists of a concrete slab that is approximately 17-feet long by 10-feet wide with a steel I-beam and steal plate system, used to support the pumps and piping.  Due to the harsh environment and despite continual maintenance, the steel support system has deteriorated.  This project will include modifications to the wet well concrete lid configuration, include construction on new discharge piping, (3) new submersible pumps, changes to the chlorine dosing system, including modifying the chlorine disinfection system from a constant feed rate to a variable feed system to be paced with the actual plant flow rate and other ancillary improvements.
Documents:
Bid Documents
Search
Main
Menu
Section
Navigation