Scope Of Work: | The existing North Lee County Water Treat Plant has an existing treatment capacity to produce 10 MGD (Million Gallons per Day) permeate by reverse osmosis (RO) treatment. An additional 1.6 MGD of blend water is added for a finished water treatment capacity of 11.6 MGD. The purpose of the project is to expand the RO treatment capacity to 15 MGD permeate, with a finished water treatment capacity of 16.9 MGD. a. The Design-Build Firm shall complete an extensive evaluation of the existing plant operations. a. The Design-Build Firm shall complete professional architectural/ engineering and permitting needed for the successful completion of the project. |