Structural Inspections: 101 Foundation/Footing 102 Floor/Slab 103 Tie Beam 104 Column/Piling
105 Rough Framing 106 Final Structural 107 Insulation 110 Soffit/Siding/Lath/Moisture Barrier
125 Shutter Final 130 Sheathing/Straps/Engineering 140 Drainage/Grading Inspection 903 Fire Wall/Tenant Separation
Plumbing Inspections: 201 1st Rough (Underground) 202 2nd Rough (Aboveground/Shower Pan) 203 Sewer 204 Final Plumbing 207 Solar
LP & Natural Gas Inspections: 205 Rough Gas 206 Final Gas 208 Gas Line 209 Gas Tank
Electrical Inspections: 301 Temporary Pole 302 Temporary Underground(RES TUG) 303 Service Change 304 Rough Electrical 305 Electrical Final 306 Temp/Perm Power (Commercial) 308 House Meter Only (Commercial) 310 Temp Overhead (RES TOH)
Mechanical Inspections: 401 Rough A/C 402 A/C Final 403 Refrigeration 404 Hood
| Roofing Inspections: 501 Roof Dry In 502 Roof In Process (concrete tile) 503 Roof Final
MH/RV/Construction Trailer: 113 Tie Down
Pool/Fountain Inspections: 101 Pool Retaining Wall 108 Pool Steel 109 Pool Deck 119 Pool Final 304 Rough Electrical Bonding
Other Inspections: 112 Aluminum Final (Screen Room & Enclosures, Carport, Roof-over, Pan Roof, etc.) 115 Awning Final 116 Demolition Final 117 Shed Final 118 Marine Final (Seawall, Dock, Rip Rap, etc.) 120 Fence Final 121 Sign Final
Fire Inspections: 902* Fire Final (Sprinklers, Paint Booths, Suppression, Alarms, Monitoring, etc.) 906* Rough Fire *Fire inspections are a two-step process. First call the automated system at 239-533-8997 to generate a fire ticket then contact the applicable fire district to coordinate the inspection date and time. |