B180278TJM - East Mulloch Drainage District (EMDD) Phase II - Debris Clean Up - Hurricane IRMA


Solicitation #:B180278TJM
Opening Date:9/6/2018  2:30 PM
Scope Of Work:East Mullock Drainage District (EMDD) covers approximately 4  square mile area and is generally bounded by Alico Road on the North, Three Oaks Parkway on the East and US 41 on the West.  A map is attached. The goal of this project is to remove debris and blockages in the canals to minimize potential for flooding of EMDD.  Lee County’s Natural Resources Division is seeking a contractor to remove and dispose of blockages generally consisting of downed trees/branches and associated collected debris in the canals highlighted in red.  Also, Lee County DOT has 4 canals that require debris and blockage removal. This may entail trimming trees and removing other obstruction to reach blockages.  The proposed work is limited from top of bank to top of bank only along the canal segments identified in blue.