Main Content

Section 9

Standard Drawings

Back to Operations Manual

Title

Standard Detail No.

Tapping Sleeve and Valve

9.1

Gate Valve Installation

9.2

Temporary Construction Water Service

9.3

Trench Cross Section

9.4

Jack and Bore

9.5

Water Pressure Line Vertical Offset W/ Ductile Iron MJ Fittings & Pipe

9.6

Waste Water Force Main Vertical Offset with Fittings, (P.V.C.)

9.7

Restrained Length Schedule

9.8

Water Service Installation 5/8" through 1"

9.9

Water Service Installation 1 " through 2"

9.10

Backflow Prevention Device "  2"

9.11

3" or Larger Meter and Backflow Prevention Device

9.12A

3" or Larger Meter and Backflow Prevention Device

9.12B

3" or Larger Double Detector Check Valve

Backflow Prevention Device for Fire Lines

9.13A

Piping Support

9.13B

Fire Hydrant Assembly

9.14

Fire Hydrant Locations/Clearance

See New Detail 6.19 Approved 08/01/13

9.15

Bollard Post Detail

9.15A

Water Main Flushing Detail

9.16

Blow Off Detail

9.17

Ductile Iron Transition Coupling

9.18

Thrust Restraining

9.19

Thrust Blocking Details

9.20

Water and Sewer Crossing Detail

9.21

Subaqueous Crossing

9.22

20" and Larger Valve Installation

9.23

Pressure Vacuum Breaker

9.24

Air Gap Detail

9.25

Bacteria Sample Valve

9.26

Automatic Air Release Valve (Water)

9.27

Master Precast Concrete Manhole

9.28

Master Manhole Cover

9.29

Manhole Frame Cover

9.30

Manhole Frame Ring

9.31

Sealed Manhole Frame Cover

9.32

Precast Manhole-Concentric

9.33

Precast Manhole-Eccentric

9.34

Manhole Drop 4' or Greater

9.35

Optional Manhole Drop 2' to 4'

9.36

Automatic Air Release Valve (Sewer)

9.37

Standard Sewer Service Laterals

9.38

Standard Sewer Service Lateral

9.39

6" Sewer Clean-Out Detail

9.40

Effluent Reuse Meter 1 " through 2"

9.41

Effluent Meter 3"

9.42

Reuse Meter Station 4" and Larger Effluent

9.43

  • Pump Station Detail  Using Valve Vault  
  • New Pump Station Details Approved 08/01/13
  • See Design Manual Section Above
  • 9.44A

  • Pump Station Detail  Using Above Ground Discharge Piping
  • New Pump Station Details Approved 08/01/13 See Design Manual Section Above
  • 9.44B

  • Electrical Control Panel and Details
  • New Pump Station Details Approved 02/13/13
  • See Design Manual Section Above
  • 9.45

  • Electrical Diagram and Notes
  • Effluent Meter Station Approved 09/14/12
  • See Design Manual Section Above
  • 9.46

    Cross Connection Control Signage

    9.47

    Irrigating With Reclaimed Water Signage

    9.48

    Water Tanker Truck-Air Gap Separation

    9.49

    Back to Operations Manual